Definition of manufacturing resource planning (MRP II)

Manufacturing Resource Planning (MRP II) Image 1

manufacturing resource planning (MRP II)

a fully integrated materials requirement planning system that involves
top management and provides a basis for both strategic
and tactical planning


Manufacturing resource planning (MRP II)

An expansion of the material requirements planning concept, with additional computer-based capabilities in the areas of
direct labor and machine capacity planning.



Related Terms:

Corporate financial planning

Financial planning conducted by a firm that encompasses preparation of both
long- and short-term financial plans.


Financial planning

The process of evaluating the investing and financing options available to a firm. It
includes attempting to make optimal decisions, projecting the consequences of these decisions for the firm in
the form of a financial plan, and then comparing future performance against that plan.


Floor planning

Arrangement used to finance inventory. A finance company buys the inventory, which is then
held in trust by the user.


GNMA-II

Mortgage-backed securities (MBS) on which registered holders receive an aggregate principal and
interest payment from a central paying agent on all of their certificates. Principal and interest payments are
disbursed on the 20th day of the month. GNMA-ii MBS are backed by multiple-issuer pools or custom pools
(one issuer but different interest rates that may vary within one percentage point). Multiple-issuer pools are
known as "Jumbos." Jumbo pools are generally longer and offer certain mortgages that are more
geographically diverse than single-issuer pools. Jumbo pool mortgage interest rates may vary within one
percentage point.


Materials requirement planning

Computer-based systems that plan backward from the production schedule
to make purchases in order to manage inventory levels.


Modigliani and Miller Proposition II

A proposition by Modigliani and Miller which states that the cost of
equity is a linear function of the firm's debt-equity-ratio.


Manufacturing Resource Planning (MRP II) Image 2

Planning horizon

The length of time a model projects into the future.


Planning, programming and budgeting system (PPBS)

A method of budgeting in which budgets are allocated to projects or programmes rather than to responsibility centres.


attribute-based costing (ABC II)

an extension of activitybased costing using cost-benefit analysis (based on increased customer utility) to choose the product attribute
enhancements that the company wants to integrate into a product


computer-aided manufacturing (CAM)

the use of computers to control production processes through numerically
controlled (NC) machines, robots, and automated assembly systems


computer integrated manufacturing (CIM)

the integration of two or more flexible manufacturing systems through the use of a host computer and an information networking system


enterprise resource planning (ERP) system

a packaged software program that allows a company to
(1) automate and integrate the majority of its business processes,
(2) share common data and practices across the entire enterprise, and
(3) produce and access information in a realtime environment


flexible manufacturing system (FMS)

a production system in which a single factory manufactures numerous variations
of products through the use of computer-controlled
robots
focused factory arrangement
an arrangement in which a
vendor (which may be an external party or an internal corporate
division) agrees to provide a limited number of
products according to specifications or to perform a limited
number of unique services to a company that is typically
operating on a just-in-time system


just-in-time manufacturing system

a production system that attempts to acquire components and produce inventory only as needed, to minimize product defects, and to
reduce lead/setup times for acquisition and production


manufacturing cell

a linear or U-shaped production grouping of workers or machines


Manufacturing Resource Planning (MRP II) Image 3

manufacturing cycle efficiency (MCE)

a ratio resulting from dividing the actual production time by total lead time;
reflects the proportion of lead time that is value-added


materials requirements planning (MRP)

a computerbased information system that simulates the ordering and
scheduling of demand-dependent inventories; a simulation
of the parts fabrication and subassembly activities that are
required, in an appropriate time sequence, to meet a production
master schedule


MRP

see materials requirements planning


MRP II

see manufacturing resource planning


planning

the process of creating the goals and objectives for
an organization and developing a strategy for achieving
them in a systematic manner


scarce resource

a resource that is essential to production
activity, but is available only in some limited quantity


strategic planning

the process of developing a statement of
long-range (5–10 years) goals for the organization and
defining the strategies and policies that will help the organization
achieve those goals


strategic resource management

organizational planning for the deployment of resources to create value for customers and shareholders; key varibles in the process include the management of information and the management of change in response to threats and opportunities


tactical planning

the process of determining the specific
means or objectives by which the strategic plans of the
organization will be achieved; it is short-range in nature
(usually 1–18 months)


Just-in-time manufacturing

The term for several manufacturing innovations that
result in a “pull” method of production, in which each manufacturing workstation
creates just enough product for the immediate needs of the next workstation in the
production process.


Material requirements planning (MRP)

A computer-driven production methodology
that manufactures products based on an initial demand forecast. It tends to result in
more inventory of all types than a just-in-time (JIT) production system.


Manufacturing Resource Planning (MRP II) Image 4

MM's proposition II

The required rate of return on equity increases as the firm’s debt-equity ratio increases.


planning horizon

Time horizon for a financial plan.


Illegal Immigration Reform and Immigrant Responsibility Act of 1996 (IIRIRA)

A federal Act shielding employers from liability if they have made
a good-faith effort to verify a new employee’s identity and employment eligibility.


Aggregate planning

A budgeting process using summary-level information to
derive various budget models, usually at the product family level.


Enterprise resource planning system

A computer system used to manage all company
resources in the receipt, completion, and delivery of customer orders.


Manufacturing resource planning

An integrated, computerized system for planning
all manufacturing resources.


Material requirements planning

A computerized system used to calculate material
requirements for a manufacturing operation.


Estate Planning

An insurance program designed to provide funds for insured's dependents upon death of the insured, and to also conserve, as much as possible, the personal assets that the insured wants to bequeath to heirs.


 

 

 

 

 

 

Related to : financial, finance, business, accounting, payroll, inventory, investment, money, inventory control, stock trading, financial advisor, tax advisor, credit.


Copyright© 2024 www.finance-lib.com